Friday, December 31, 2010

Christmas 2010

Well Christmas 2010 is forever past. However it was a memorable one in two ways for me.

First and foremost:

The whole family was together for Christmas eve. It was a short time together as they had to share themselves with other parts of their families. But it was the best gift of all >>> Great while it lasted.


The second event:

VIA came to the KIP:


"Happy New Year"


Saturday, December 18, 2010

Another day of breakfast, hobby shop then work on the layout with friends Gord and Colin. Life is good!!

More scenery and lighting added. Unfortunately you have to be here to see the lighting in the dark. However, at least now services in the church don't have to be during the day. Gord got the church wired up for lights. Colin continued to apply his masterful scenery techniques to the Scott Junction area.

Lots of progress and lQQkin good ***



Meanwhile over at the abandoned mine the hobos had a roaring fire going.

Tuesday, December 7, 2010

Since I am confined to the house with Bronchitis, I had a choice of doing Christmas decorating or workin' on the railroad. Not to difficult to know which I picked. I decided that it was time to finish the North end of the mountain so I created the 'White Cliffs', the will be painted when all are in place.


Quebec Gatineau GP 39, on lease to KIP coming down the mountain having just delivered a load of empties to the Moose Rock Timber logging site.


A closer look at the 'White Cliffs'.

OK back to the decorating!


Saturday, November 27, 2010


Last Saturday ground cover in the area of the North tunnel entrance was added. Today a friend returned to me a diesel that he had converted the decals from Huron Central to Quebec Gatineau.

If I can figure out how to do it, I will add a short video of the engine pulling out a tank car from the local fuel distributor .


Tuesday, November 16, 2010

Shoring up the line

The curve at the bottom of the Moose Rock Grade developed a negative superelevation, (Not sure there is such a thing ) but what was happening was the train leaned outwards instead of inwards when going around the curve. The outside rail had to be elevated to provide a superelevation. To do this a structure of logs, ties, gravel and dirt was constructed to hold up the rail thrugh the curve.




Saturday, November 13, 2010

Construction on the KIP continues

Today the crew continued work on the KIP.

Gordon worked on providing electricty to the village of Kipawa.


Umm! I see the lights are on in Kipawa thanks to Gord, but I see someone driving without head lights. Have to fix that :-)).

Last week Colin and his crew (Himself) installed stone retaining walls. This week the ballast was added and the vegetation trimmed (Installed).


Meanwhile business goes on:





Saturday, October 30, 2010

Soggy underpinings

The KIP line passes through some fairly wet areasCalls to shore up those areas is fairly common. Today the maintenance gang installed a great deal of rock work to shore up the elevated track just outside of the village.



In addition all the water running from the end of Moose Rock, caused the track on the curve to sink creating a negative super elevation, i.e. elevation towards the outside of the curve vice inside. The solution .... elevate the outside rail and build a retaining wall to maintain the roadbead in a proper super-elevation. Here we see the track being elevated and the beginings of the retaining wall, more to come....